The tub has been flipped upright. Construction on the superstructure begins.
Wednesday, April 9, 2025
Subscribe to:
Post Comments (Atom)
Photos of progress
Completing Framing and Applying Plywood Plywood skin complete. Adding poor man’s fiberglass. Preparing to load on the truck Loaded. There i...
-
Applying Poor Man’s Fiberglass The application consists of using Titebond II glue to apply Landscape fabric. Several more layers of glue ar...
-
Now that the frame is completed I have been applying the exterior plywood which is glued to foamboard insulation. This gives the structure g...
-
The tub or base of the camper is the part which will slide into the bed of the truck. the floor is 1” foamboard insulation sandwiched betwee...




No comments:
Post a Comment